A.Routine docking repair
B.Voyage repair
C.Damage repair
D.Conversion
您可能感興趣的試卷
你可能感興趣的試題
A.Because it is difficult to plan and manage
B.Because it is cannot be well categorized
C.Because it is a difficult work for people to undergo
D.Because it is seldom researched by research
A.inform the chief engineer whenever there are problems
B.reduce the time wasted on checking items
C.know who is responsible for the domestic cleaning equipment
D.know the chain of authority on the ship
A.send a requisition list to the supplier
B.check that whether the items ordered have been already delivered
C.make the chief engineer on sport
D.follow a preset procedure
A.make clear of your authority
B.make friends with ships crew
C.call the first engineer if there is a problem
D.call the master if there is a problem
A.Chief engineer
B.Second engineer
C.Master
最新試題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Cold weather starting of a diesel engine may be made easier by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
If separating effect is not good, which measure should be taken ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Using a file without a handle may result in ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()