A.fire fighting
B.leakage blocking
C.abandon ship
D.integration
您可能感興趣的試卷
你可能感興趣的試題
A.the emergency lighting system for muster and abandon ship
B.air oil emergency shut-down
C.ME emergency operation
D.main auxiliary steering gear changing
A.the chief engineer leaves the engineer room with the engine room log book at first
B.releasing compressed air in the air receiver and closing the watertight door
C.stopping all the running machineries and electric devices
D.closing the quick-closing valves of all the oil tanks, stopping the boiler and releasing gas
A.4
B.3
C.2
D.1
A.must connect the bilge well suction directly
B.should not pump out the water accumulated in the cargos
C.should not used for emergency drainage in case of ship collision
D.should connect to the fire fighting system directly
A.the main S-W pump
B.ballast pump
C.air-conditioning water pump
D.the main S-W pump or ballast pumps that have the biggest output
最新試題
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Which of the following items don’t belong to dock repair works?()
The ISPS Code consists of a mandatory section-Part A, which shows()