A.the main S-W pump
B.ballast pump
C.air-conditioning water pump
D.the main S-W pump or ballast pumps that have the biggest output
您可能感興趣的試卷
你可能感興趣的試題
A.the harbor bureau
B.the government of the flag state
C.the ship classification society
D.ship company
A.maritime safety administration
B.ship survey bureau
C.company manager
D.captain
A.captain
B.chief engineer
C.chief engineer and captain consult together
D.chief engineer and superintend consult together
A.if the ship must be stand by
B.if M-E should be stopped
C.if keep-watching as in voyage
D.if the ship must anchor two anchors
A.in/ut port
B.passing through big bridge
C.big steering angle for direction changing
D.in/out port and passing through big bridge
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The ISPS Code consists of a mandatory section-Part A, which shows()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Under MARPOL Code the ship to which it applies has to carry ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()