A.captain
B.chief engineer
C.chief engineer and captain consult together
D.chief engineer and superintend consult together
您可能感興趣的試卷
你可能感興趣的試題
A.if the ship must be stand by
B.if M-E should be stopped
C.if keep-watching as in voyage
D.if the ship must anchor two anchors
A.in/ut port
B.passing through big bridge
C.big steering angle for direction changing
D.in/out port and passing through big bridge
A.first survey and certificate exchange survey
B.first survey and operation survey
C.first survey and periodic survey
D.classification survey and certificate exchange survey
A.ship products survey
B.notarization survey
C.ship safety inspection
D.counseling service and publishing ship name list
A.periodic survey
B.statutory survey
C.additional survey
D.annual survey
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Using a file without a handle may result in ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish