A.stow
B.stowing
C.stowed
D.be stowed
您可能感興趣的試卷
你可能感興趣的試題
A.out of
B.away from
C.from away
D.out from
A.burton fall
B.down fall
C.hatch fall
D.stay fall
A.red or green to conform with the other lateral aids
B.red and green horizontally-striped
C.solid yellow
D.white with orange marks
A.horizontally banded buoys
B.vertically striped buoys
C.yellow buoys
D.spherical buoys
A.the falls from unhooking if the releasing gear is operated accidentally while the boat is being lowered
B.operation of the release lever until the boat is waterborne
C.the falls from rehooking after they have been released
D.accidental unhooking when the falls become slack
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
Please tell your tallymen to()out the marks in the holds during discharging.
The man directing and supervising the work of stevedores is the().
Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.
When general cargo with different amounts in each draft is involved,the checker must use the ().
Foreman,the ship(),please get the stevedores to fill the port wings with heavier packages.
Preventer bars are fitted on lifeboat releasing hooks to prevent().
We’ll adopt the mechanical tallying method().
()is not an advice be observed when samples are taken in tanks containing volatile petroleum products.
The full utilization of berths can be achieved if().
You are transporting dangerous cargo on your vessel.You must inspect this cargo().