A.Maximum mooring line tension divided by the anchor's weight in air
B.Anchor's weight in air divided by the maximum mooring line tension
C.Preloading tension divided by the anchor's weight in air
D.Operating tension divided by the anchor's weight in air
您可能感興趣的試卷
你可能感興趣的試題
A.Absorb erosion of high velocity discharge stream
B.Seal pump shaft against entry of air
C.Isolate the outlet side from the inlet side
D.Dampen the turbulent discharge flow
A.Oil temperature
B.Manifold pressure
C.Exhaust gas temperature
D.Fuel consumption
A.Enforcement of smoking restrictions
B.Restricting vessels from coming alongside the barge
C.Insuring that a combustible gas indicator is aboard
D.Protecting cargo hose with chafing gear
A.Reduce the loading rate
B.Notify the engine room of the procedure
C.Maintain communications with the dock man
D.Give the operation your undivided attention
A.A prohibition from loading a cargo from a country when the cargo may be a carrier of infectious diseases
B.Arrest of a vessel by legal authorities to satisfy claims through exercise of a maritime lien
C.Damage caused by riot of the population of a port
D.Losses caused by fines from polluting the harbor after malfunction of a piping system
最新試題
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
How should you signal the crane operator to lower the boom and raise the load().
The Master or person in charge of a ship shall ensure the crane record book shows the().
How should you signal the crane operator to hoist().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
What is/are the advantage(s)of cranes over conventional cargo booms().
Most pedestal crane power is provided by().
On no account()to be exceeded.
The net productivity per gang-hour can be improved through a decrease of().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().