A.loading
B.leaving
C.arriving
D.sailing
您可能感興趣的試卷
你可能感興趣的試題
A.booster pump coming on the line and discharging properly
B.booster pump failing to start
C.booster pump being lined up in the wrong direction
D.ship's pump speeding up
A.arranging cargo
B.shipping cargo
C.cargo handling
D.weighing cargo
A.spilling
B.leaking
C.dumping
D.All of the above
A.flat
B.up
C.upright
D.vertical
A.moors
B.moor
C.is moored
D.mooring
最新試題
The Master or person in charge of a ship shall ensure the crane record book shows the().
The net productivity per gang-hour can be improved through a decrease of().
They()loading at 1400 hours.
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
The item()is not the advantage of the hydraulic winch.
How should you signal the crane operator to hoist().
Pedestal cranes have limit switches to restrict movement of which function(s)().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
What is the purpose of the equalizing beam aboard a crane vessel().