A.ISM code
B.ISPS code
C.IBC code
D.FSS code
您可能感興趣的試卷
你可能感興趣的試題
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
A.24 hours
B.2 hours
C.1 hours
D.15 minutes
A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.there were an actual emergency
A.100%
B.110%
C.85%
D.different
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The main purpose of port State control is not to()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If separating effect is not good, which measure should be taken ()
Using a file without a handle may result in ()