A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
您可能感興趣的試卷
你可能感興趣的試題
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
A.24 hours
B.2 hours
C.1 hours
D.15 minutes
A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.there were an actual emergency
A.100%
B.110%
C.85%
D.different
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of shaft
D.main engine crankshaft deflection
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
() is not installed on the main switchboar.
Which of the following items don’t belong to dock repair works?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Diesel engine air start system check valves are opened by ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()