A.Keep a load on the hoist until all personnel are finished working
B.Set the load on a movable dolly when transportation may be needed
C.Have one man keep a hand on the load to steady it
D.Insure that the lifting gear capacity is not exceeded
您可能感興趣的試卷
你可能感興趣的試題
A.Posting posters illustrating practices
B.Showing video tapes of actual accidents
C.Incorporating safety practices in daily routine
D.Publishing comprehensive safety rules
A.Speed
B.Excessive knowledge or skill
C.Human error
D.Excitement
A.Unsafe actions
B.Orderliness
C.Frequent inspections
D.Good work habit
A.Securing equipment against slipping or drifting
B.Operating machinery at its recommended speed
C.Repairing loose handles on tools before using
D.Using tools for purpose for which they are not designed
A.approved by the Coast Guard
B.high carbon steel
C.fixed with a ferrous cover
D.nonsparking
最新試題
Under MARPOL Code the ship to which it applies has to carry ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
If separating effect is not good, which measure should be taken ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The cetane rating of diesel fuel is an indication of the ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The ISPS Code consists of a mandatory section-Part A, which shows()