A.Posting posters illustrating practices
B.Showing video tapes of actual accidents
C.Incorporating safety practices in daily routine
D.Publishing comprehensive safety rules
您可能感興趣的試卷
你可能感興趣的試題
A.Speed
B.Excessive knowledge or skill
C.Human error
D.Excitement
A.Unsafe actions
B.Orderliness
C.Frequent inspections
D.Good work habit
A.Securing equipment against slipping or drifting
B.Operating machinery at its recommended speed
C.Repairing loose handles on tools before using
D.Using tools for purpose for which they are not designed
A.approved by the Coast Guard
B.high carbon steel
C.fixed with a ferrous cover
D.nonsparking
A.the forced ventilating system is operating
B.the cargo pumps are secured
C.no monocarbon gases are present
D.the oily water separator is de-energized
最新試題
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Under MARPOL Code the ship to which it applies has to carry ()
The cetane rating of diesel fuel is an indication of the ()
The condensers located in various stages of a flash evaporator are cooled by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()