Which of the following operations must be entered on the Oil Record Book Part Ⅰ? ()
Ⅰ.Routine discharge at sea of bilge water containing oil from the machinery spaces
Ⅱ.Bunkering of fuel oil
A.Ⅰ only
B.Ⅱ only
C.both Ⅰ and Ⅱ
D.neither Ⅰ nor Ⅱ
您可能感興趣的試卷
你可能感興趣的試題
A.ammeter
B.voltmeter
C.wattmeter
D.frequency meter
A.wrap the arm in a tight bandage
B.soak the arm in hot salt water
C.cover the burn with petroleum jelly
D.put the burn in cold water
A.SOLAS 74
B.MARPOL 73/78
C.STCW 78/95
D.ISM Code
A.the owner of the ship
B.the manager who assumes the responsibility for operation of the ship
C.the bareboat charterer
D.All of the above
A.physical state
B.temperature
C.atmospheric pressure
D.sensible pressure
最新試題
Under MARPOL Code the ship to which it applies has to carry ()
The treatment of the fuel oils involves storage, heating, filtering and()
If separating effect is not good, which measure should be taken ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Cold weather starting of a diesel engine may be made easier by()
Diesel engine air start system check valves are opened by ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()