A.viscosity
B.pour point
C.volatility
D.lower explosive limit
您可能感興趣的試卷
你可能感興趣的試題
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.safety regulations
B.technical regulations
C.minimum requirements
D.standard requirements
A.STCW78
B.STCW95
C.SOLAS74
D.SOLAS88
A.six months
B.one year
C.three year
D.five years
When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that ()
Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented
Ⅱ.auxiliary machinery used for maneuvering is readily available
Ⅲ.permanent air or steam pressure is available for sound signals
A.Ⅰ+Ⅱ
B.Ⅰ+Ⅲ
C.Ⅱ+Ⅲ
D.Ⅰ+Ⅱ+Ⅲ
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
The cetane rating of diesel fuel is an indication of the ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The shipboard oil pollution emergency plan will be invalid after ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Flame failure in an automatically fired auxiliary boiler can from a/an ()