A.safety regulations
B.technical regulations
C.minimum requirements
D.standard requirements
您可能感興趣的試卷
你可能感興趣的試題
A.STCW78
B.STCW95
C.SOLAS74
D.SOLAS88
A.six months
B.one year
C.three year
D.five years
When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that ()
Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented
Ⅱ.auxiliary machinery used for maneuvering is readily available
Ⅲ.permanent air or steam pressure is available for sound signals
A.Ⅰ+Ⅱ
B.Ⅰ+Ⅲ
C.Ⅱ+Ⅲ
D.Ⅰ+Ⅱ+Ⅲ
A.in any emergency or if in any doubt as to what decision or measures to take
B.in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
C.when isolating and bypassing machinery to be worked on
D.co-operating with any engineer in charge of maintenance work
A.the chief engineer
B.the designated engineer from shipyard
C.the designated duty officer in charge of the engineering watch
D.the designated surveyor from classification society
最新試題
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Using a file without a handle may result in ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Which of the following items don’t belong to dock repair works?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
() is not installed on the main switchboar.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()