A.diesel oil
B.magnesium
C.dunnage
D.electrical insulation
您可能感興趣的試卷
你可能感興趣的試題
A.bedding
B.pipe insulation
C.paint
D.a generator
A.engine room bilges
B.main switchboard
C.paint locker
D.rag bin
A.only if fixed containment is not used
B.only if portable containment is not used
C.only if fixed containment drains are open
D.whenever the vessel is being bunkered
A.plugging all scuppers and drains
B.placing floating booms around the ship
C.regularly emptying all drip pans
D.thoroughly draining all bunkering hoses
A.wash down the area immediately with a fire hose
B.wash down the area with kerosene
C.cover the area with absorbent material
D.cover the area with foam
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Under MARPOL Code the ship to which it applies has to carry ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The treatment of the fuel oils involves storage, heating, filtering and()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Diesel engine air start system check valves are opened by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Using a file without a handle may result in ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()