A.engine room bilges
B.main switchboard
C.paint locker
D.rag bin
您可能感興趣的試卷
你可能感興趣的試題
A.only if fixed containment is not used
B.only if portable containment is not used
C.only if fixed containment drains are open
D.whenever the vessel is being bunkered
A.plugging all scuppers and drains
B.placing floating booms around the ship
C.regularly emptying all drip pans
D.thoroughly draining all bunkering hoses
A.wash down the area immediately with a fire hose
B.wash down the area with kerosene
C.cover the area with absorbent material
D.cover the area with foam
A.transmitting the heat of a fire through the ship s metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
A.Acetylene
B.Lube oil
C.Grease
D.All of the above
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Diesel engine air start system check valves are opened by ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The cetane rating of diesel fuel is an indication of the ()