A.draw a one line diagram of the circuitry
B.test all fuses and measure the line voltage
C.take megger readings
D.insulate the apparatus from ground
您可能感興趣的試卷
你可能感興趣的試題
A.melts and must be replaced
B.is enclosed in a tube of insulating material with metal ferrules at each end
C.gives no visual indication of having opened the circuit
D.trips to break the circuit and may be reset
A.brushes on a commutator
B.brushes on slip rings
C.slip rings on a commutator
D.direct connections from the stator
A.heat-resisting acrylic
B.heat-resisting aluminum
C.insulating varnish
D.insulating white lead
A.hydrogen chloride
B.calcium chloride
C.sulfuric acid
D.muriatic acid
A.can be reset to energize the circuit
B.should open the circuit when overloaded
C.will burn out when an over current flow develops
D.All of the above
最新試題
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Cold weather starting of a diesel engine may be made easier by()
The shipboard oil pollution emergency plan will be invalid after ()
Under MARPOL Code the ship to which it applies has to carry ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.