A.the Fixture Note
B.the Declaration of DWTC
C.the Notice of Readiness
D.the Notice of Demurrage
您可能感興趣的試卷
你可能感興趣的試題
A.marine broadcast Notice to Mariners
B.Weekly Notices to Mariners
C.corrected editions of charts
D.Light Lists
A.is
B.are
C.will be
D.shall be
A.notice
B.notify
C.notificate
D.note
A.Bill of health
B.Free Pratique
C.Notice to Comply
D.Controlled Free Pratique
A.at
B.to
C.of
D.about
最新試題
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
PLEASE BE ADVISED THE CAPTIONED VESSEL PROVISIONS SUPPLY HAS BEEN DULY ARRANGED AND SHIP CHANDLER WILL GO ON BOARD YR GOOD SHIP TO ATTEND TO THIS AFTER BERTHING. This telex says that ().
That BE IT KNOWN THAT MV GLUCKAULF UNDER MY COMMAND HAS A DWC OF 12,431 M/T ON SUMMER LOADLINE,AND A BALE CAPACITY OF 18,439 CU.M.AND A GRAIN CAPACITY OF 19,941 CU.M.is likely to be the wording of().
Mariners are FIRST warned of serious defects or important changes to aids to navigation by means of().
Please return the copies attached()your signature.
The external flotation bladder on an immersion suit should be inflated().
Ships changing their location within the port limits are also required to report their new ().
The effect of wind on exposed areas of the vessel is most noticeable when().
I’m not fully aware()what happened at the loading port.
This is to bring()your notice that MV Utopia has anchored too close to my ship.