A.at
B.to
C.of
D.about
您可能感興趣的試卷
你可能感興趣的試題
A.enters into
B.enters
C.enters in
D.enters to
A.delay
B.state
C.delete
D.contain
A.noted
B.noticed
C.notificated
D.notified
A.no notice
B.one day's notice
C.a week's notice
D.thirty (30) days notice
A.allowed
B.forbidden
C.approved
D.disliked
最新試題
This is to bring()your notice that MV Utopia has anchored too close to my ship.
Please return the copies attached()your signature.
I’m not fully aware()what happened at the loading port.
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
This is to advise you that MV Water Way arrived at Sheerness at 1000 hours on May 14th and the formalities for entering the port were passed at 1040 hours on the same day.Now she is in all respects ready and fit to discharge her cargo of grain in bulk. Theses sentences are likely to appear in().
the undersigned,Master of MV Roslyn,certify that my vessel()the conditions laid down in Articles 18 and 45 of the Navigation Regulations.
The issue of Notices to Mariners of charts and these aids(Radar beacons)may be delayed until such time as they are assessed to be().
In the absence of a custom or special contract to the contrary,the Shipowner is not bound to ()the consignees that he is ready to unload on arriving at the port of discharge.
On a clear,warm day,you notice the approach of a tall cumulus cloud. The cloud top has hard well defined edges and rain is falling from the dark lower edge. Should this cloud pass directly overhead().
Notice of Readiness to Load must be served()the Charterer or his agent.