單項(xiàng)選擇題Entries should be made in a Ro-Ro vessel’s cargo-securing device record book for().

A.procedures for accepting cargo securing devices
B.procedures for maintaining and repairing cargo-securing devices
C.record of cargo securing device inspections
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Cargo transfer operations on a tank vessel need NOT be stopped when().

A.a tug comes alongside while the tanker is loading grade
B.and E cargoes B. a large,fresh oil spill is discovered immediately adjacent to the side of the tanker
C.there is an electrical storm in the vicinity
D.there is a fire on the dock or on a nearby vessel

3.單項(xiàng)選擇題An obstruction on a helodeck is any object that might present a hazard to the().

A.rotor blades and landing gear
B.unloading of passengers
C.loading of cargo
D.pilot's visibility

4.單項(xiàng)選擇題An inert gas system on a tanker should be used to().

A.prevent the generation of flammable or combustible gas in tanks
B.blow out cargo lines to prevent the build up of gas concentrations
C.dilute tank atmospheres to keep gas concentrations below the lower explosive limit
D.prevent fires in the pumproom by continually displacing flammable vapors

5.單項(xiàng)選擇題An inert gas system installed on a tanker is designed to().

A.aid in the stripping and cleaning of cargo tanks
B.increase the rate of discharge of cargo
C.force toxic and explosive fumes from a cargo tank to vent to the outside atmosphere
D.lower the oxygen levels inside cargo tanks,making explosion nearly impossible

最新試題

Entries should be made in a Ro-Ro vessel’s cargo-securing device record book for().

題型:單項(xiàng)選擇題

A fire is discovered in the bow of your vessel while making way. The wind is from ahead at 35 knots. You should().

題型:單項(xiàng)選擇題

Cargo transfer operations on a tank vessel need NOT be stopped when().

題型:單項(xiàng)選擇題

Between 1830 hrs and 1850 hrs this day,strong gusty winds()by my vessel,in consequence of which the vessel’s four mooring lines were broken.

題型:單項(xiàng)選擇題

A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().

題型:單項(xiàng)選擇題

After sending a message describing the symptoms of an ill crew member,you receive a message containing the code MRL. This means().

題型:單項(xiàng)選擇題

A frame with two,or sometimes four,arms through which are threaded the guidelines and which is used to keep the drill stem and bit in line with the center opening in the temporary guide base is the().

題型:單項(xiàng)選擇題

A fishing vessel displaying the lights shown is().

題型:單項(xiàng)選擇題

It is not necessary to declare()in the Health List.

題型:單項(xiàng)選擇題

A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind ().

題型:單項(xiàng)選擇題