單項(xiàng)選擇題在Word的編輯狀態(tài)下,選擇了整個(gè)表格,執(zhí)行了表格菜單中的刪除行命令,則()。

A.整個(gè)表格被刪除
B.表格中一行被刪除
C.表格中一列被刪除
D.表格中沒有被刪除的內(nèi)容


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題在Windows9X中,若在某一文檔中連續(xù)進(jìn)行了多次剪切操作,當(dāng)關(guān)閉該文檔后剪貼板中存放的是()。

A.空白
B.所有剪切過的內(nèi)容
C.最后一次剪切的內(nèi)容
D.第一次剪切的內(nèi)容

最新試題

翻譯:Other additives are often added to the fracturing fluids for special proposes. Corrosion inhibitors may be used if the fracturing fluids might cause corrosion in the tubular goods in the well.Other additives are used to make the part of the fracturing fluid which is moving against the pipe walls behave almost like lubricating oil while the remaining fracturing fluid take an almost solid form to carry the maximum amount of proppant.

題型:問答題

翻譯:The primary limitations for gas lift operations are the lack of formation gas of an outside source of gas, wide well spacing, and available space for compressors on off-shore plat forms. Generally, gas lift is not applicable to single-well installations and widely spaced wells that are not suited for a centrally located power system.

題型:問答題

翻譯:A paraffin base crude is an oil whose chief components are paraffins, and which completely distilled, leaves a solid residue of wax. An asphalt base crude is an oil composed primarily of cyclic compounds (mostly naphthenes) which, when distilled, leaves a solid residue of asphalt. Oils which fall in the middle of these categrories are classified as mixed base.

題型:問答題

翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.

題型:問答題

翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.

題型:問答題