問答題翻譯:Proper planning of any drilling venture is the key to optimizing operations and minimizing expenditures.

您可能感興趣的試卷

你可能感興趣的試題

最新試題

翻譯:The transportation of oil has also led to the spectacular development of gait ships ,the largest ships that ever sailed the oceans of the world .in the last few years ,since it has been necessary to ship oil from middle East-one of the largest oil producing regions-around the cap of Good Hope in south Africa these tanks has grown to almost unblievable proportions.

題型:問答題

翻譯:The application of physics to the study of rocks (geophysics)is very important in petroleum geology. In its broadest application geophysics makes a major contribution to understanding the earths crust and, especially through the application of modern plate tectonic(板塊構(gòu)造)theory, the genesis and petroleum potential of sedimentary basins. More specially, physical concepts are required to understand folds(褶皺), faults(斷層), and diapers(底辟), and hence their roles in petroleum entrapment.

題型:問答題

翻譯:crude petroleum is not an equilibrium mixture, and on a geological time scale its composition is slowly changing. S.R.silverman found that heating at 121C for two weeks caused detectable changes, the low-molecular-weight components formed being isotopically lighter so far as the carbon was concerned, than the original.

題型:問答題

翻譯:A reservoir trap is a combination of physical conditions that will cause hydrocarbon liquids and/or gases and water to accumulate in porous and permeable rock and prevent them from escaping either laterally or vertically because of differences in specific gravity, pressure, fluid/gas characteristics, and/or lithology. It has the capability of collection, holding, and yielding hydrocarbon fluids and water.

題型:問答題

翻譯:The fluids of a petroleum reservoir are generally gas, oil, and water in varying proportions. Each phase can differ widely in composition and properties. Gas and oil, either as separate fluids or in mixtures, change their state or phase as reservoir pressure changes.

題型:問答題

翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.

題型:問答題

翻譯:In addition to being useful as an exploration tool, subsurface maps are a necessary part of any reservoir engineering study; and petroleum engineers, as well as geologists, must be completely familiar with their construction and interpretation.

題型:問答題

翻譯:This chapter deals with the fundamental properties of reservoir rocks. The properties discussed are (1) porosity - a measure of the void space in a rock; (2) Permeability - a measure of the fluid transmissivity of a rock; and (3) fluid saturation - a measure of the gross void space occupied by a fluid. These properties constitute a set of fundamental parameters by which the rock may be described quantitatively.

題型:問答題

翻譯:The total quantity of petroleum now thought to exist on Earth is about 14 trillion gallons. In weight that is only one-ninth as much as the total existing quantity of coal and ,at the present moment, petroleum is being used up much more quickly. At the present rate of used, the worlds supply of petroleum may last for only thirty years or so.

題型:問答題

翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.

題型:問答題