Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()
A.Configure a dynamic routing protocol.
B.Configure SVI interfaces with IP addresses and subnet masks.
C.Configure switch ports with network addresses.
D.Configure switch ports with the autostate exclude command.
E.Document the MAC addresses of the switch ports.
您可能感興趣的試卷
你可能感興趣的試題
A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.
What might explain what happened? ()
A.The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
B.The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
C.The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
D.The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.
You have just created a new VLAN on your network for inter-VLAN routing.
What is one step that you should include in your VLAN-based implementation and verification plan?()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
D.Verify that the VLAN virtual interface has been correctly created and enabled.
You have just created a new VLAN on your network for inter-VLAN routing.
What is one step that you should include in your VLAN-based implementation and verification plan?()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
D.Verify that the VLAN virtual interface has been correctly created and enabled.
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN-based implementation and verification plan? ()
A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN based implementation and verification plan? ()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command.
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
最新試題
Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()
Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()
Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()
Which option correctly identifies the Cisco IOS switching methods in descending order from the fastest method to the slowest method?()
Refer to the exhibit. For what purpose is the command show ip cef used?()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()
Refer to the exhibit. Which Virtual Router Redundancy Protocol (VRRP) statement is true about the roles of the master virtual router and the backup virtual router?()
What is the configured priority value of the Vlan105’s group on DS2 ?()
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
Refer to the exhibit. What will happen when one more user is connected to interface FastEthernet 5/1? ()