單項選擇題

You have just created a new VLAN on your network.
 What is one step that  you should include in your VLAN based implementation and verification plan? ()

A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command. 
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan

2.單項選擇題When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

3.單項選擇題

You are planning a new VLAN-based network solution. 
What is one item you should consider when creating your implementation plan as it concerns VLANs?()

A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and  configured
C.administrator assignments
D.rollback plan

4.單項選擇題What network information do you need when you plan to implement a VLAN-based solution?()

A.default VLAN information for all unused switch ports
B.802.1x configuration parameters 
C.number of IP subnets needed
D.IP routing protocol information

最新試題

DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()

題型:單項選擇題

Which statement is correct about RSTP port roles?()

題型:單項選擇題

Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()

題型:單項選擇題

Refer to the exhibit. What will happen when one more user is connected to interface FastEthernet 5/1? ()

題型:單項選擇題

Refer to the exhibit. LACP has been configured on Switch1 as shown. Which is the correct command set to configure LACP on Switch2?()

題型:單項選擇題

Which three statements about STP timers are true?()

題型:多項選擇題

Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()

題型:單項選擇題

Refer to the exhibit. What command was issued on the Layer 3 switch Sw1 between Exhibit #1 and Exhibit #2?()

題型:單項選擇題

Refer to the exhibit and the partial configuration of switch SW_A and SW_B. STP is configured on all switches in the network. SW_B receives this error message on the console port:00:06:34: %CDP-4-DUPLEX_MISMATCH: duplex mismatch discovered on FastEthernet0/5 (not half  duplex), with SW_A FastEthernet0/4 (half duplex) , with TBA05071417(Cat6K-B) 0/4 (half duplex). What would be the possible outcome of the problem?()

題型:單項選擇題

What is the configured priority value of the Vlan105’s group on DS2 ?()

題型:單項選擇題