A.預(yù)拌混凝土拌合站氣溫>25℃,延續(xù)時(shí)間90min B.拌混凝土拌合站氣溫≤25℃,延續(xù)時(shí)間120min C.施工現(xiàn)場(chǎng)氣溫>25℃,延續(xù)時(shí)間60min D.施工現(xiàn)場(chǎng)氣溫≤25℃,延續(xù)時(shí)間120min
A.1mm B.2mm C.3mm D.5mm
A.20℃ B.25℃ C.30℃ D.35℃