A.metacentric height is positive
B.metacentric radius is positive
C.KG exceed maximum allowable limits
D.Free surfaces are excessive
您可能感興趣的試卷
你可能感興趣的試題
A.20 minutes
B.15 minutes
C.10 minutes
D.5 minutes
A.2 minutes
B.3 minutes
C.4 minutes
D.5 Minutes
A.who have performed work for 14 hours
B.who have performed work in a scheduled rest period
C.who have performed work in a scheduled work period
D.who works hard
A.give access to
B.links up with
C.have contact with
D.is constructed of
A.14 hours
B.10 hours
C.6 hours
D.It does not matter as long as my overtime is paid for
最新試題
What is it called when it is possible to ignite the vapour above the oil?()
Which of the following is not an operation mode of AIS?()
When the wave period and the apparent rolling period are the same().
The helm command PORT TWENTY means().
It is dangerous for vessels without the operational radar()the estuary.
Before any loading takes place any signs of the previous cargo should do().
Berthing means bringing a vessel to her berth until().
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
Bales close to the deckhead should be covered to prevent().
The company should establish and maintain procedures to control all documents and date which are relevant to().