A.rudder
B.propeller
C.radar
D.sider thruster
您可能感興趣的試卷
你可能感興趣的試題
A.no direct openings
B.direct openings
C.no more than one direct opening
D.up to one direct opening
A.immediate stopping
B.immediate maneuvering
C.immediate anchoring
D.immediate going astern
A.ISM
B.CCS
C.SMS
D.SOLAS
A.New personnel
B.Personnel transferred to new assignments
C.All crewmembers
D.New personnel and Personnel transferred to new assignments
A.dew point increases
B.dew point decreases
C.relative humidity increases
D.relative humidity decreases
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
The company should establish and maintain procedures to control all documents and date which are relevant to().
ECDIS must be able to perform all of the following EXCEPT().
()is on the panel of radar.
Which of the following is not a form of precipitation?()
The loading of the ship must be done in accordance with().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
The helm command PORT TWENTY means().
()is where the crew eat their meals.
Which of the following shall not the officers in charge of the navigational watch do?()