A.possible
B.impossible
C.proper
D.improper
您可能感興趣的試卷
你可能感興趣的試題
A.bang
B.shut
C.lock
D.close
A.in
B.on
C.at
D.for
A.when can the stevedores finish loading
B.when will the stevedores finish loading
C.when the stevedores can finish loading
D.when the stevedores finish loading can
A.careful
B.skill
C.concern
D.caution
A.has expired
B.has been expired
C.has expiring
D.be expired
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
The mean draft of a ship is the draft().
The company should establish and maintain procedures to control all documents and date which are relevant to().
The helm command PORT TWENTY means().
A tide is called diurnal when().
The ISM code is part of().
The dew point temperature is().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
The force resulting from the earth’s rotation that causes winds to deflect to the right in the Northern Hemisphere and to the left in the Southern Hemisphere is called().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
Manoeuvring information can not be obtained from().