A.to be carried out
B.carry out
C.be carried out
D.will carry out
您可能感興趣的試卷
你可能感興趣的試題
A.moving
B.movement
C.from the movement
D.them from moving
A.at
B.by
C.with
D.on
A.on
B.to
C.at
D.for
A.at
B.for
C.with
D.about
A.repair
B.to repair
C.repairing
D.repaired
最新試題
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()
The ISM code is part of().
()is where the crew eat their meals.
Before any loading takes place any signs of the previous cargo should do().
When the wave period and the apparent rolling period are the same().
The dew point temperature is().
In the Northern hemisphere northerly winds may cause temperature().
The company should establish and maintain procedures to control all documents and date which are relevant to().
ECDIS must be able to perform all of the following EXCEPT().