A.or
B.and
C.but
D.when
您可能感興趣的試卷
你可能感興趣的試題
A.put paint on
B.apply paint onto
C.oil
D.paint
A.above the explosive range
B.within the explosive range
C.below the explosive range
D.None of the above
A.determine the cause before taking countermeasures
B.assume the shift is due to off-center loading
C.counterflood on the side opposite the list or trim
D.assume the cause is environment forces
A.brace it with dunnage
B.cover it with large pieces
C.fill it with small pieces
D.leave it as it is
A.mold to develop on commodities
B.malfunction of the refrigeration equipment
C.contamination of the insulation in the space
D.All of the above
最新試題
Full details of all lights and fog signals are shown on().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
The loading of the ship must be done in accordance with().
Which of the following is not an operation mode of AIS?()
The dew point temperature is().
What is it called when it is possible to ignite the vapour above the oil?()
The ISM code is part of().
The helm command PORT TWENTY means().
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
In the Northern hemisphere northerly winds may cause temperature().