A.cranes/derricks
B.crane/derrick cycles
C.crane/derrick cycle time
D.weight per package
您可能感興趣的試卷
你可能感興趣的試題
A.applied
B.supplied
C.replied
D.complied
A.hatch boards
B.tank top
C.hatch beams
D.sweat bettens
A.working hours
B.gangs
C.idle time
D.weight per set
A.To support the overhang of the stern
B.To strength the plating against the pounding of the sea
C.To add srength to the deck beams which support the weather deck
D.To support the plating of a cylindrical tank
A.will put
B.would put
C.put
D.shall put
最新試題
()is where the crew eat their meals.
It is dangerous for vessels without the operational radar()the estuary.
The circulation around a low pressure center in the Northern Hemisphere is().
Which of the following shall not the officers in charge of the navigational watch do?()
The helm command PORT TWENTY means().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Full details of all lights and fog signals are shown on().
The dew point temperature is().
In the Northern hemisphere northerly winds may cause temperature().
Which of the following is not an operation mode of AIS?()