A.maximum sustained vertical load an anchor will resist before dragging
B.maximum sustained horizontal load an anchor will resist before dragging
C.maximum sustained vertical load an anchor will resist before the mooring line breaks
D.maximum sustained horizontal load an anchor will resist before the mooring line breaks
您可能感興趣的試卷
你可能感興趣的試題
A.personnel line
B.whip line
C.main hoist line
D.pendant
A.gooseneck
B.step
C.swivel
D.pintle
A.factory pallet
B.shipping pallet
C.stevedoring pallet
D.warehouse pallet
A.top or upstream beginning of a bend
B.bottom or downstream beginning of a bend
C.midpoint or center radius of a bend
D.center line or apex of a bend
A.This is the best place to land
B.You are seen - assistance will be given as soon as possible
C.Tail block is made fast
D.Slack away
最新試題
It’s not advisable to cut()the power supply.
The heaviest type pallet is the().
In case of your steering gear failed,()should be exhibited in shapes or lights.
The hinge fitting used to attach the boom to the mast is the().
In order to detect rot in manila lines,you should().
The hoist line primarily used for lifting personnel on ship cranes is called the().
LIFTING THE ANCHOR FROM THE BOTTOM is called().
In the International Code of Signals,the code signal meaning I require immediate assistance is().
Under the forces of its own weight,the suspended length of line will fall into a shape known as a().
When evacuating a seaman by helicopter lift,which statement is TRUE?()