A.received
B.retrieved
C.relieved
D.resumed
您可能感興趣的試卷
你可能感興趣的試題
A.in charge of
B.arranged
C.decided to
D.the depth of
A.be the first individual to board the craft
B.drain the hydraulic pressure before lowering the craft
C.have a list of the persons assigned to the lifeboat
D.All of the above
A.What do
B.What you say
C.What you said
D.What did you say
A.Having ignored him
B.To have been ignored
C.To be ignored
D.Having been ignored
A.on
B.in
C.for
D.at
最新試題
Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT().
During the manufacture of line,yarns are twisted together in the().
During the day,a dredge will indicate the side on which it is safe to pass by displaying().
Each hand portable,semi-portable and fixed fire extinguishing unit on a ship must be tested and inspected at least once every().
During storm conditions on a ship,the mooring tensions should be adjusted so that().
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?()
Each drilling unit equipped with helicopter fuel storage tanks must have the tanks installed as far as practicable from the().
Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().
Each OSV must carry().
Each fire pump on a tanker must have a pressure gauge located at().