A.lower most continuous deck not broken by water tight bulkheads
B.after most weather deck above the main strength deck
C.upper or weather deck above the main strength deck
D.deck of light construction below the main or strength deck
您可能感興趣的試卷
你可能感興趣的試題
A.seaplanes
B.non-displacement craft
C.barges
D.All of the above
A.comfortable
B.suitable
C.stable
D.favorable
A.length between the perpendiculars
B.length along the waterline
C.length overall
D.registered length
A.has no more than two compartments
B.has two compartments in addition to the engine room
C.will sink if any two compartments are flooded
D.will float if any two adjacent compartments are flooded
最新試題
Deck beams on a ship are generally spaced at equal intervals and run().
Define the acronym MSI().
Control of fire should be addressed().
Compared to a low pressure system,generally the air in a high is().
Compared to internal structural plating,the exterior hull plating on a ship is usually().
Corrosive liquids and acids should have which kind of label?()
Channel 13 is primarily used for ship to ship communication. Channel 13 is also authorized for().
Dacron sails,when not in use,may be damaged if().
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Changing rescuers while carrying out artificial respiration should be done().