A.in a locked cabinet in the machinery space
B.in an unlocked cabinet in the machinery space
C.in a separate and accessible location
D.at a fire hydrant location
您可能感興趣的試卷
你可能感興趣的試題
A.Cargo Manifest
B.Certified Crew List
C.Stores List
D.All of the above
A.4,based on the breaking strength
B.5,based on the maximum allowable stress
C.6,based on the maximum working load
D.8,based on the normal working load
A.breadth dimension
B.builder's name
C.brake horsepower
D.revolutions per minute
A.Hoist rope is not kinked
B.Multiple part lines are not twisted around each other
C.The hook is centrally located over the load
D.All of the above
A.approved oil-water separating equipment
B.a fixed or portable containment system at the shore connection
C.a spare pump in case the main pump is inoperative
D.at least one outlet accessible from the weather deck
最新試題
A stay is().
A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
A splice that can be used in running rigging,where the line will pass through blocks,is a().
The Purchaser shall(),prior to the ship’s departure,the invoiced amount at the rate of exchange applicable on the day of payment.
Your vessel has just finished bunkering and has a small list due to improper distribution of the fuel oil. This list will cause().
Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()
A small light tackle with blocks of steel or wood that is used for miscellaneous small jobs is called a().
You are passing the Bayou Sara gage which reads 3.9 feet. Which of the following statements is TRUE?()
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
If the Vendor is unable to make delivery,or to make delivery in good time,owing to force majeure then the Vendor’s obligation to deliver shall().