A.make the trip only after obtaining a Permit to Proceed to Another Port for Repair,F(xiàn)orm CG-948
B.get underway as soon as possible
C.hire a tug and pilot instead
D.request an Expiration Certificate if the vessel displays a tendency to sink
您可能感興趣的試卷
你可能感興趣的試題
A.Illumination by flood lights
B.A quick flashing red light at each lower corner
C.A strobe light visible both up and downstream
D.Fixed amber lights under the extreme outer edges of the traveller
A.hull cleaning
B.derusting and painting
C.the maintenance of boiler
D.docking and undocking
A.The rusting area
B.The rusted area
C.The corroded area
D.The corrosive area
A.install shoring so the shoring supports the damaged bulkheads without pushing on them
B.install shoring so that it pushes on the damaged bulkhead while supporting it
C.use jacks or chain falls to remove the set before installing shores
D.place sandbags by the bulkhead without installing shores
最新試題
Manifest and cargo plan are the two most important shipping papers required for().
In comparison to electric power,hydraulic power for jacking systems has the advantage of().
If your bridge-to-bridge radiotelephone ceases to operate,you must().
I hereby request permission to()the ship hull for routine maintenance.
Repairing damage to the hull at or above the waterline reduces the threat of().
No repairs can be done without the Harbor Master’s().
If the ship sustains such damage that repairs are necessary,the master must put into the nearest port()such repairs can be effected.
The notice of casualty to a vessel must include().
I’ll have the damaged parts repaired in Hongkong and send you in due course the amount of expenses().
The deck control valve to be()after being repaired.