單項(xiàng)選擇題Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()

A.Any internal transfer of oil cargo during a voyage
B.The discharge overboard in port or at sea of any bilge water accumulated in machinery spaces
C.The loading or unloading of any or all oil cargo
D.All of the above


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題Which of the following statements describes one of the functions of the ballast system?()

A.To permit flooding of any fuel oil storage tank on any class of ship
B.To use it as a secondary service system
C.To store reserve feed or potable water for extended cruises
D.To stabilize the ship by flooding certain designed tanks with seawater

3.單項(xiàng)選擇題The abbreviation "GM" is used to represent the ()

A.height of the metacenter
B.fighting arm
C.righting moment
D.metacentric height

4.單項(xiàng)選擇題A segregated ballast system is a system where ()

A.all ballast is processed through the oily water separator
B.ballast is taken on and discharged through a separate main deck riser
C.ballast and cargo tanks are separated by cofferdams
D.all ballast lines, tanks, and pumps are independent of those used for oil

5.單項(xiàng)選擇題A vessel is required to carry an Oil Record Book Part I to log entries in the book regarding the ()

A.discharge of ballast or cleaning water from fuel tanks
B.sounding levels of all fuel tanks on a daily basis
C.grade and specific gravity of all fuel oil carded
D.fuel consumption rates on a weekly basis

最新試題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:單項(xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:單項(xiàng)選擇題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:單項(xiàng)選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:單項(xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:單項(xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項(xiàng)選擇題

Which of the following items don’t belong to dock repair works?()

題型:單項(xiàng)選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:單項(xiàng)選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:單項(xiàng)選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:單項(xiàng)選擇題