A.masters
B.chief engineers
C.crew
D.all personnel
您可能感興趣的試卷
你可能感興趣的試題
A.18
B.16
C.22
D.20
A.18
B.16
C.22
D.20
A.10 hours in any 24-hour period
B.72 hours in any seven-day period
C.ten hours in any 24-hour period
D.88 hours in any seven-day period
A.14 hours in any 24-hour period
B.77 hours in any seven-day period
C.ten hours in any 24-hour period
D.88 hours in any seven-day period
A.the ship owner
B.the manager or bareboat charterer
C.a person assuming the responsibility for ship operation
D.a business enterprise dealing with freight
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Cold weather starting of a diesel engine may be made easier by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()