A.2
B.3
C.4
D.1
您可能感興趣的試卷
你可能感興趣的試題
A.registry
B.ship hull
C.nationality
D.replacing machineries and electric devices
A.surveyor
B.chief engineer
C.captain
D.chief mate
A.Ship Survey Bureau
B.CCS
C.Maritime Safety Administration
D.all of the above
A.starting
B.running
C.running-in
D.direction changing
A.after the mooring trial has passed
B.before the mooring trial
C.under the surveyors supervision
D.after repair
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The main purpose of port State control is not to()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
To proceed to the assistance of a ship in distress is()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()