A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
您可能感興趣的試卷
你可能感興趣的試題
A.Ammeter
B.Voltmeter
C.Wattmeter
D.Synchroscope
A.argo winch
B.Windlass
C.Steering gear
D.Air compressor
A.Emergency fire pump
B.Windlass
C.Main sea water pump
D.Fresh water pump
A.Accommodation lighting
B.Windlass
C.Main sea water pump
D.Compressor
A.Navigation lamp
B.Windlass
C.Main sea water pump
D.Compressor
最新試題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
The cetane rating of diesel fuel is an indication of the ()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The ISPS Code consists of a mandatory section-Part A, which shows()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The main purpose of port State control is not to()