單項選擇題In the process of the shafting management, special attention should be paid to()

A.on the sailing, the water in the aft peak tank should be excluded as much as possible
B.the stuffing style ahead sealing shouldn’t have any water leaking out
C.Simplex astern sealing shouldn’t have any oil leaking out
D.Simplex ahead sealing can have some oil leaking out


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The main advantage of improved Simplex tailshaft seal are()

A.the good sealing performance and the simple structure
B.the good sealing performance and the short life expectancy
C.the good sealing performance but the short life expectancy
D.the good sealing performance and the lower cost

2.單項選擇題Simplex tailshaft seal equipment’s working condition is terribleThe main cause is ()

A.the shafting’s vertical vibration
B.violent friction and sea water corrosive
C.friction and high temperature
D.violent friction and high temperature

3.單項選擇題The center line condition of the transmission shaft can be checked by()

A.the border flange’s excursion and flection
B.the both end shafts line’s accordance
C.the border flange’s flection and the both end shafts line’s accordance
D.the border flange’s accordance and both end shafts flection degree

4.單項選擇題In the navigation() cause the shafting over load easily.

A.the stopping engine suddenly
B.the sailing astern and changing direction suddenly
C.the sailing from the shallow water area to the deep water area
D.the ship’s trim too much

5.單項選擇題When the vessel on the full speed ahead, if full astern immediately () the main engine start astern and fuel injection.

A.after the thrust power is zero
B.after the torsion is zero
C.surpass the critical point on the water turbo phase
D.after the speed is zero

最新試題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:單項選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:單項選擇題

The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()

題型:單項選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:單項選擇題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:單項選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:單項選擇題

Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()

題型:單項選擇題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:單項選擇題

The ISPS Code consists of a mandatory section-Part A, which shows()

題型:單項選擇題