A.Revised MARPOL Annex Ⅰ
B.Revised MARPOL Annex Ⅱ
C.International convention for the control and management of ships ballast water and sediments
D.ISPS Code
您可能感興趣的試卷
你可能感興趣的試題
A.competent authority
B.CSO
C.PSCO
D.Master
A.DOC
B.DOS
C.SSP
D.SMC
A.The Contracting Governments
B.The Port Authorities
C.The Master
D.The Company Security
A.an International Ship Security Certificate
B.an International Oil Pollution Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.an International Ship Security Certificate
B.an International Oil Pollution Prevention Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The shipboard oil pollution emergency plan will be invalid after ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The cetane rating of diesel fuel is an indication of the ()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Under MARPOL Code the ship to which it applies has to carry ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Cold weather starting of a diesel engine may be made easier by()