A.precaution measures
B.safety measures
C.security measures
D.emergency response measures
您可能感興趣的試卷
你可能感興趣的試題
A.the SSO
B.the PSCO
C.the CSO
D.the Administration
A.Ship Security Officer
B.Designated Person Ashore
C.Internal Auditor
D.Patrol Team
A.5%
B.8%
C.6%
D.3%
A.the International Convention for the Safety of the Life at Sea
B.the International Convention for the Prevention from ships
C.the International Convention on Standards of Training, Certification and Watch keeping for Seafarers
D.the International Convention for the Control and Management of Ship’s Ballast Water and Sediments
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
最新試題
() is not installed on the main switchboar.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Using a file without a handle may result in ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The main purpose of port State control is not to()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish