單項(xiàng)選擇題The () should be gradually reduced after FWE.

A.fuel oil
B.cooling water
C.starting air
D.auxiliary blower


您可能感興趣的試卷

你可能感興趣的試題

3.單項(xiàng)選擇題During the watch at sea () should be logged or recorded in the engine log book.

A.the running hours of the cooling water pump
B.chief engineer’s order
C.the main parameters of main and auxiliary equipment
D.the position of the vessel

4.單項(xiàng)選擇題During the watch keeping at sea, routine adjustments should be ()

A.made and noted as required by the duty engineer
B.reported to chief engineer immediately after being made by duty engineer
C.never made before getting permission from chief engineer
D.made as required but not logged

5.單項(xiàng)選擇題During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.

A.the main propulsion plant
B.lifesaving jackets
C.lifeboat engine
D.state of emergency generator

最新試題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:?jiǎn)雾?xiàng)選擇題

The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.

題型:?jiǎn)雾?xiàng)選擇題

Cold weather starting of a diesel engine may be made easier by()

題型:?jiǎn)雾?xiàng)選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

Flame failure in an automatically fired auxiliary boiler can from a/an ()

題型:?jiǎn)雾?xiàng)選擇題

() is not installed on the main switchboar.

題型:?jiǎn)雾?xiàng)選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題