A.How they finished
B.How did they finished
C.That how they finished
D.That how did they finished
您可能感興趣的試卷
你可能感興趣的試題
A.6%
B.8%
C.10%
D.12%
A.Class A
B.Class B
C.Class C
D.Class D
A.class A
B.Class B
C.Class C
D.Class D
A.Class A
B.Class B
C.Class C
D.Class D
A.Class A
B.Class B
C.Class C
D.Class D
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The cetane rating of diesel fuel is an indication of the ()
The shipboard oil pollution emergency plan will be invalid after ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Diesel engine air start system check valves are opened by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()