A.inform chief engineer officer immediately
B.stop the generator
C.let the duty officer in bridge determine how to do
D.wait for help
您可能感興趣的試卷
你可能感興趣的試題
A.MARPOL 73/78
B.SOLAS 74
C.STCW 78/95
D.ISPS 2002
A.safety
B.the ship, its machinery and crew
C.immediate action
D.the engineer in charge
A.at the beginning of every watch
B.at the beginning of the first watch every day
C.at the completion of every watch
D.at noon every day
A.1/2
B.1
C.2
D.3
A.reciprocating pump
B.vane pump
C.screw pump
D.centrifugal pump
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The shipboard oil pollution emergency plan will be invalid after ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Diesel engine air start system check valves are opened by ()