A.winch speed
B.boom strength
C.load radius
D.cable strength
您可能感興趣的試卷
你可能感興趣的試題
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.Overloading
B.Overstowage
C.Overbooking
D.Overcarriage
最新試題
Which method should be used to warm up the pump turbines prior to discharge().
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
Running an electric winch at slow speed over a long period of time causes().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
The item()is not the advantage of the hydraulic winch.
The net productivity per gang-hour can be improved through a decrease of().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
When viewed from above,the best position for the guy in relation to the boom is().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().