A.broken valve springs
B.tight drive belts
C.high line voltage
D.air in the system
您可能感興趣的試卷
你可能感興趣的試題
In order to achieve greater dehumidification with an air conditioning system, you should ()
Ⅰ.reduce the cooling coil
Ⅱ.temperature increase the re-heater temperature
A.Ⅰonly
B.Ⅱ only
C.BothⅠandⅡ
D.NeitherⅠnorⅡ
A.Height of the machine
B.Temperature of the liquid seal
C.Gravity disc
D.Bowl diameter
A.system is overcharged with refrigerant
B.system is low on refrigerant
C.discharge valves are leaking excessively
D.discharge valves are leaking slightly
A.decrease
B.increase
C.decrease to zero
D.remain unchanged
A.purge lube oil from the liquid refrigerant
B.recover water purged from the system
C.separate foul gases from the receiver
D.purge non-condensable gases without losing refrigerant
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
If separating effect is not good, which measure should be taken ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The shipboard oil pollution emergency plan will be invalid after ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The main purpose of port State control is not to()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The ISPS Code consists of a mandatory section-Part A, which shows()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.