A.before
B.when
C.after
D.during
您可能感興趣的試卷
你可能感興趣的試題
A.maximum counter weight required
B.minimum horsepower required
C.hoist rope strength
D.allowable load
A.horizontal position of the boom
B.vertical position of the boom
C.horizontal position of the load being lifted
D.vertical position of the load being lifted
A.length of the boom
B.angle of the boom
C.lifting capacity of the boom
D.direction of the boom
A.to use
B.to operate
C.maneuvering
D.using
A.is the S.W.L. of the crane
B.are the S.W.L. of the crane
C.the S.W.L. of the crane is
D.the S.W.L.of the crane are
最新試題
How should you signal the crane operator to lower the boom and raise the load().
Which statement comparing a shipboard crane to conventional gear is TRUE().
The item()is not the advantage of the hydraulic winch.
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
The net productivity per gang-hour can be improved through a decrease of().
When using slings,cargo handlers should take all the following precautions except().
Most pedestal crane power is provided by().