A.a burned out solenoid in the oil supply valve
B.high temperature excess air
C.incorrectly setting the hot-well dump valve
D.an incorrectly positioned burner snubber realy
您可能感興趣的試卷
你可能感興趣的試題
A.clean the flame scanner photocell window
B.Inspect and clean all solenoid valves
C.lift the safety valves by hand
D.Inspect for oil or water leaks
A.cold fuel oil
B.low fuel oil pressure
C.low atomizing steam pressure
D.water in the fuel oil
A.adding hydrazine
B.blowing down the boiler
C.adding phenolphthalein
D.adding a sulfite chloride scavenger
A.increase exhaust gas velocity through the boiler
B.reduce accumulations of carbon deposits on the heat transfer surfaces
C.eliminate exhaust gas pulsations and noise
D.increase the rate of heat transfer to the waterside
A.soap hardness
B.nitrog encontent
C.chloride content
D.dissolved CO2
最新試題
() is not installed on the main switchboar.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The treatment of the fuel oils involves storage, heating, filtering and()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The condensers located in various stages of a flash evaporator are cooled by()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the following items don’t belong to dock repair works?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The shipboard oil pollution emergency plan will be invalid after ()